108 King William Street
108 King William Street, Adelaide
Installed new gearless hoist machines and updated control and drive systems. Upgrades to the lift car interiors and operating panels, including new media display screens, enhance user experience and ensure compliance with current safety and WH&S standards.
184 Forbes Street, Darlinghurst
184 Forbes Street, Darlinghurst
Installed new gearless hoist machines and control and drive systems to enhance lift efficiency and reliability. New car power door operators and operating panels, featuring integrated media display screens, have significantly upgraded the building's vertical transportation system, providing a modern and user-friendly interface.
234 George Street
234 George Street, Sydney
Removed outdated armatures and controllers, completing a full lift upgrade that incorporates the latest technology for improved efficiency and reliability.
25 National Circuit
25 National Circuit, Forrest
Directed lifecycle planning, design documentation, tender process, and onsite project management for five lifts, ensuring advanced system reliability and user safety.
323 Castlereagh Street, Sydney
323 Castlereagh Street, Sydney
Completed major destination control system upgrade which included new controls, drives, hoist machines along with new aesthetic lift car finishes in both the low and high rise banks. The car park shuttle lift was replaced with new machine-room-less lift technology, significantly improving building transport efficiency and reliability.
552 Lonsdale Street
552 Lonsdale Street, Melbourne
Conducted a lifecycle audit and provided detailed reporting for capital planning for two lifts, facilitating informed decision-making for future upgrades and maintenance.
66 Wyatt Street
66 Wyatt Street, Adelaide
Successfully completed a full replacement of the existing lift system, incorporating advanced technology to enhance functionality and improve user security.
889 Collins Street, Docklands
889 Collins Street, Docklands
Performed maintenance condition audits and prepared new maintenance agreements for six lifts, ensuring long-term efficiency and compliance through detailed annual audits.
97 Bathurst Street, Sydney
97 Bathurst Street, Sydney
Installed new MX32 gearless hoist machines and updated the control and drive systems. Enhanced lift car interiors and operating panels, alongside new display screens, ensuring compliance with current safety and WH&S standards.
ACT Property Group
Fyshwick, ACT
Coordinated lifecycle planning, design documentation, tender process, and onsite project management for ten lifts across various sites, streamlining operations and enhancing system integrity.
Adelaide Airport
Sir Richard Williams Ave, Adelaide Airport
Performs annual audits of all vertical transportation equipment at Adelaide Airport, ensuring each system is maintained to the highest standards for optimal performance and sustained maintenance excellence.
Australian National University
Canberra, ACT
Oversaw lifecycle planning, design documentation, tender process, and onsite project management for six lifts, improving functionality and safety for university infrastructure.
Burwood
155 Warrigal Road, Burwood
Performed a lifecycle audit and reporting for two lifts, aiding in the strategic planning of capital investments and maintenance schedules.
Henley Beach Surf Life Saving Club
246 Esplanade, Henley Beach
Conducts annual condition and lifecycle audits, assessing the standard of maintenance. Proudly supporting the community as a sponsor of the Henley Beach Surf Life Saving Club.
Macleay Regis
12 Macleay Street, Potts Point, Sydney
Installed a new geared hoist machine, new control and drive systems, and new car power door operators. Upgraded bronze fixtures and enhanced safety with updated lift code and WH&S improvements to this Heritage listed building.
Melbourne Quarter
628 Flinders Street, Docklands
Conducted maintenance condition audits and prepared a new maintenance agreement for seven lifts. Managed tendering and ongoing annual condition audits to uphold operational standards.
Miller Street
40 Miller Street, North Sydney
Completed a destination control system upgrade to enhance operational efficiency and user experience, with a focus on integrating advanced technology seamlessly into the existing infrastructure. Scope of works included new controls, drives, hoist machine and architecturally designed lift car interior finishes.
Milsons Point
96-98 Alfred Street, Milsons Point
Updated lift car interiors, operating panels, and display screens, and installed state-of-the-art MX18 gearless hoist machines along with advanced control and drive systems to elevate the user experience.
Oaks Harmony
107-121 Quay Street Haymarket, Sydney
Revamped car interiors and button panels, incorporating new safety features and 18.5" multimedia display screens to enhance user interactions. New controls, drive and gearless hoist machines and improved safety standards.
Oaks Liberty Tower
25-29 Colley Terrace Glenelg
Executed a detailed condition and lifecycle audit, assessing maintenance conditions. Currently managing the tender process for an ongoing lift maintenance agreement to uphold high standards of operation.
Oaks Melbourne Suites
57-61 City Road, Southbank
Undertook maintenance condition audits and prepared new maintenance agreements for four lifts, followed by tendering to ensure high standards of lift functionality.
Oaks on Market
60 Market Street, Melbourne
Managed life cycle planning, design documentation, tender process, and onsite project management for five lifts, ensuring streamlined operations and maintenance.
Oaks Plaza Pier Hotel
16 Holdfast Promenade, Glenelg
Performed a detailed condition and lifecycle audit, assessing the standard of maintenance to ensure continued functionality and compliance with safety standards.
Orbis and Momentum
97-99 Palmerston Crescent South Bank
Conducted maintenance condition audits, prepared new maintenance agreements, and managed the tendering process for three lifts to ensure continuous operational standards.
Promenade
34-36 Prospect Street, Box Hill
Completed end of defect liability period auditing and initiated ongoing maintenance agreement preparations for three lifts, ensuring sustained performance and compliance.
Sunday Apartments
65 Coventry Street, South bank
Handled three lifts' maintenance condition audits and prepared a new maintenance agreement, managing the tendering process to ensure ongoing operational excellence.
Telstra House
30 Pirie Street, Adelaide
Conducted a detailed condition and lifecycle audit, including traffic flow analysis, and provided recommendations to enhance lift performance and improve the PCA grade rating. Prepared comprehensive design documentation and a request for tender package for future lift system upgrades.
The Metropolitan
3 London Circuit, Canberra
Managed a significant project involving lifecycle planning, design documentation, tender process, and onsite project management for ten lifts, enhancing efficiency and reliability across the board.
The Peak
2 Quay Street, Haymarket
Upgraded the elevator systems with new gearless hoist machines and state-of-the-art control and drive systems. The installation of new car power door operators and operating panels, equipped with media display screens, has enhanced the functionality and user experience, elevating the overall standard of the building's vertical transport facilities.